Products for quality renovation

Floor Covering and Non-woven Fixative

Ready-to-use fixation for PVC and CV floor coverings as well as carpets with fleece, textile, fabric and foam backing. The coverings adhere securely, do not blister and can be removed later without damaging the floor (particularly recommended for rented flats). Suitable for rooms with underfloor heating and for use with chair castors in accordance with DIN EN 12529.

  • for carpets with fleece, textile, fabric and foam backing as well as PVC and CV floor coverings
  • Easy to remove with water
  • Secure adhesion
  • Very low emission according to EC 1
  • solvent-free
  • Suitable for loads from chair castors in accordance with DIN EN 12529
  • Suitable for underfloor heating
  • for indoors
Container sizes: 1piece(s)
Pallet: 40piece(s)
Item no.: 102787
EAN: 4016215102787

Technical data sheet Toggler

Area of application

Fixation for PVC, CV floor coverings and carpets. Secure hold without bubbles, can be removed later, ideal for rented flats, underfloor heating and indoor chair castors.

Preparation

Can be used on cement screed, tiles, PVC coverings, V100 chipboard, waterproof sealed parquet and similar moisture-resistant substrates. The substrate must be clean, permanently dry, level, load-bearing and evenly absorbent and free of dust and release agents. For rough or uneven substrates, we recommend levelling with floor levelling compound. Pre-treat highly absorbent, sandy and porous substrates with baufan Deep Primer LF. The floor covering to be fixed must be conditioned, levelled and relaxed.

Processing

Lay out the floor covering, cut roughly to size and fold back halfway. Apply the fixative to the substrate using a short-pile roller or a notched trowel (toothing A2). After allowing the required flash-off time, lay the covering and press down evenly. For absorbent substrates or vapour-permeable coverings, the flash-off time is approx. 15 minutes; when laying impermeable coverings (e.g. PVC) on non-absorbent substrates, a flash-off time of at least 30 minutes must be observed. Fix the second half of the floor covering in the same way. Weigh down edges and joints if necessary. Removing the covering: Once the covering has been removed, the fixing residues can be removed with water and baufan wallpaper stripper. Leave the solution to work for approx. 15 minutes, remove the residue with a plastic scraper and rinse thoroughly with water.

Consumption

approx. 200-300 g/m²

Storage

Keep container tightly closed in a cool but frost-free place. If unopened and stored properly, shelf life is at least 48 months from date of manufacture (see batch label).

Notes

Processing temperature: +10 °C to +30 °C for material, circulating air and substrate The installation guidelines of the flooring manufacturer must be observed. Remove fixing residues immediately with water. Keep out of reach of children. Ensure adequate ventilation during application and drying. Avoid eating, drinking and smoking during processing. In case of contact with eyes or skin, rinse immediately with plenty of water. Do not allow to enter the sewage system, waterways or soil. Only dispose of empty containers for recycling.
We hereby point out that all pictures, graphics and texts on this website are protected by copyright. The use and transmission are only permissible with our written approval. It is expressly prohibited to use our pictures and advertising materials without our written approval.